SciELO - Scientific Electronic Library Online

 
vol.25 issue1Influence of the Automated Configuration System on the Change Management Process of the IP Area of a Mobile Operator in Peru During the COVID-19 PandemicHigh Performance Leadership and its Relationship with the Organizational Climate in a Peruvian Company in the Industrial Sector in Lima, 2021 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

  • Have no cited articlesCited by SciELO

Related links

  • Have no similar articlesSimilars in SciELO

Share


Industrial Data

Print version ISSN 1560-9146On-line version ISSN 1810-9993

Abstract

TICONA GREGORIO, Hugo Iván. Lean Six Sigma Application to Improve Sub-Process Failure Repair in Communication Links. Ind. data [online]. 2022, vol.25, n.1, pp.205-228.  Epub July 31, 2022. ISSN 1560-9146.  http://dx.doi.org/10.15381/idata.v25i1.22194.

The troubleshooting process for communication links in telecommunications is a complex process that is divided into sub-processes; one of these sub-processes is Failure Repair. In this paper, Lean Six Sigma is applied in to improve this sub-process. As a result, the monthly average of the Repair Time (TR) improved in 36.7%, and the Repair Time Yield (YTR) improved in 300.08%.

Keywords : Telecommunications; Lean Six Sigma; Repair Time; Yield; failures.

        · abstract in Spanish     · text in English | Spanish     · English ( pdf ) | Spanish ( pdf )